AUDIT GUIDE 08: Conducting On-Site Audit Activities – Execution and Communication

On-site audit execution is the phase where auditors carry out the agreed audit plan at the auditee’s location. It runs from the opening meeting through document review, evidence collection by interview, observation and sampling, daily communication, and findings, to the closing meeting, following ISO 19011:2018 clause 6.4 so conclusions rest on verifiable evidence.

Executing an on-site audit effectively takes clear communication, defined roles and structured document review. Well-run opening meetings, daily reviews and closing activities keep the audit objective and produce results the organization can act on. For the groundwork that comes before this stage, read our guide on Preparing for On-Site Audits.

PopularCert is an independent consulting firm. Certification audits are performed by accredited certification bodies.

Table of Contents

Based on ISO 19011 Guidelines

This guide follows the audit execution principles in ISO 19011:2018, Guidelines for auditing management systems, the internationally recognized reference for planning and conducting first-, second- and third-party audits. Following this structure keeps your audit program in line with accepted practice, whether you are preparing for an internal audit or hosting an external certification body.

Opening Meeting

An opening meeting should be held with the auditee’s management or, where appropriate, those responsible for the functions or processes to be audited before the commencement of the audit.

Get Free Consultation

Our Clients

Clients-Logos

Projects

Live-Projects-PopularCert

Our Happy Clients

⭐⭐⭐⭐⭐
“PopularCert made our ISO certification process smooth and professional.”
— Manufacturing Client, Oman

⭐⭐⭐⭐⭐
“Excellent support and documentation guidance.”
— Healthcare Client, Saudi Arabia

⭐⭐⭐⭐⭐
“PopularCert simplified our ISO certification process with professional guidance and fast support.”
— Manufacturing Client, Saudi Arabia

Internal audit: In small organization’s, the opening meeting may simply consist of communicating that an audit is being conducted and explaining its nature.

External audit: The meeting should be formal, chaired by the audit team leader, and attendance records kept. Visit our blog on Audit Methods and Evidence.

Opening Meeting Agenda

The following points should be covered:

  • Introduction of participants, including observers and guides, and outline of their roles

  • Confirmation of audit objectives, scope, and criteria

  • Confirmation of audit plan (timetable) and other arrangements

  • Presentation of methods to be used, including sampling

  • Introduction of methods to manage risks created by audit team presence

  • Confirmation of communication channels and language

  • Confirmation of cultural, religious, or social customs.

  • Availability of resources and facilities

  • Confidentiality and information security

  • Health, safety, emergency, and security procedures

  • Availability and role of guides

  • Reporting methods and grading of nonconformities

  • Conditions under which the audit may be terminated

  • Format and schedule of closing meeting

  • Feedback system from the auditee

  • On completion, a brief site tour may be conducted to acquaint the team with the premises.

Audit Objectives and Program Review

Clarify audit purpose: to evaluate systems, not reject the auditee

  • Review audit plan/schedule

  • Confirm working hours, lunch arrangements, and breaks

Before an ISO audit begins, the lead auditor should confirm the audit objectives, scope, criteria, schedule, and responsibilities with the organization’s representatives. The purpose is to establish how the management system will be evaluated against the applicable requirements using objective evidence not simply to search for faults or reject the auditee.

During this stage, the auditor typically:

  • Confirms the audit objectives, scope, and applicable criteria.
  • Reviews the audit plan, timetable, departments, sites, and processes to be assessed.
  • Identifies the process owners and key personnel required during interviews.
  • Reviews relevant previous audit findings and unresolved nonconformities, where applicable.
  • Confirms how documents, records, interviews, observations, and sampling will be used as audit evidence.
  • Establishes communication methods between the auditor and auditee during the assessment.
  • Confirms practical arrangements such as working hours, breaks, site access, safety requirements, and confidentiality.
  • Provides an opportunity for management to raise questions or clarify concerns before audit activities begin.

A well-defined audit program helps keep the assessment focused, minimizes unnecessary disruption to operations, and ensures that audit conclusions are based on consistent and verifiable evidence.

On-Site Audit Arrangements to Agree at the Opening Meeting

Topic

What to agree

Methods and Procedures

Findings are discussed daily with the auditee. Agree who represents the auditee at the daily review meetings.

Auditee’s Representative

The auditee assigns a representative to accompany the auditors. Representatives sign Audit Findings Reports as witnesses, not as agreement.

Facilities

Confirm workspace, network access, printing and other facilities in advance, so there are no unsuitable last-minute arrangements.

System Deficiency

Recurring findings may indicate a system deficiency.

Extent of the Audit

An audit cannot cover every activity. Findings reflect the sample examined, and an absence of findings does not mean there are no issues.

Final Meeting

Explain the format, date, time, venue and participants.

Confidentiality

Findings are confidential. Reference NDAs where applicable.

Aborting the Audit

An audit may be aborted if there are major documentation problems, senior management commitment is lacking, major system changes affect proper functioning, or co-operation is missing.

Issue of Final Report

The report goes to the organization on whose behalf the audit is conducted. Third-party registration reports are also sent to the auditee.

Legal Aspects

Legal waivers or releases are discussed if auditors could be held liable.

Time Limit for Corrective Action

Agree the corrective action procedures and timeframes.

Initial Look at the Premises

A site visit before the meeting improves planning and lets the schedule be adjusted.

Performing Document Review During the Audit

  • Review documentation to determine conformity and gather evidence

  • Combined with other audit activities as long as effectiveness is not affected

  • If documentation is inadequate, audit may be suspended until resolved

Worked Example: Sampling and Evidence in Practice

An audit cannot examine every record, so auditors use sampling. ISO 19011:2018 does not prescribe sample sizes. The auditor chooses a sample that is representative and sensible for the risk, then reports conclusions only within what was actually examined.

Illustrative scenario (hypothetical figures): An internal audit of an ISO 9001:2015 manufacturer, covering control of nonconforming outputs (clause 8.7). The company raised 48 nonconformity reports (NCRs) in the last six months across two sites.

Step 1: Define the population and the question.
The population is all 48 NCRs from the last six months. The audit question is: Were nonconforming outputs identified, controlled and dispositioned by authorized people, with records kept?

Step 2: Choose the sampling approach and size.
The auditor selects 10 of the 48 NCRs. This is a judgement sample, not a standard requirement, and it is built as follows:

Selection basis

NCRs selected

Why

Open longer than 30 days

3 (all of them)

Highest risk of uncontrolled product

Customer-reported

2

Escapes that reached the customer

Site A, random

3

Coverage of the larger site

Site B, random

2

Coverage of the second site

Step 3: Collect and verify evidence.
For each NCR, the auditor combines three methods: document review (the NCR and disposition record), interview (the person who authorized disposition) and observation (the quarantine area).

NCR

Method

Evidence examined

Result

NCR-014

Record + interview

Disposition signed by QA manager, rework instruction completed

Conforms

NCR-021

Record + observation

Part tagged and found in the quarantine area

Conforms

NCR-033

Record + interview

“Use as is” approved by a supervisor with no authority; no customer concession on file

Gap

NCR-039

Record

Closed with no evidence of re-inspection

Gap

Other 6 NCRs

Record + interview

Complete and consistent

Conform

Step 4: Evaluate and report.
Two of the 10 sampled records show gaps. The auditor reports exactly that: “In a sample of 10 of 48 NCRs, 2 lacked evidence of authorized disposition or re-inspection.” The auditor does not claim that 20% of all 48 NCRs fail. Because the gaps point to a possible systemic issue with disposition authority, the audit team may extend the sample, and they agree this at the daily review.

Step 5: Agree the facts.
Present the two NCR numbers to the process owner at the daily review, so the facts are agreed before the closing meeting.

Communication During the Audit

  • Hold periodic team discussions to assess progress.
  • Report significant risks immediately to the auditee and the audit client.
  • Report any out-of-scope issues so they can be communicated where appropriate.

Roles of Guides/Escorts and Observers

  • Guides and observers assist the audit without interfering with it.
  • Health, safety, security and confidentiality are managed between the audit client and the auditee.
  • Guide responsibilities include arranging interviews and site visits, providing clarification and witnessing audit activities.

On-Site Audit Execution Checklist

Use this as a working checklist and adapt it to your audit plan and criteria.

Before the opening meeting

  • Audit plan, scope, objectives and criteria confirmed with the auditee
  • Auditee representative or guide assigned
  • Workspace, network access and printing arranged
  • Site safety, security and confidentiality requirements understood

Opening meeting

  • Attendance recorded; team, observers and guides introduced
  • Objectives, scope, criteria and timetable reconfirmed
  • Audit methods and sampling approach explained
  • Communication channels, language and daily review time agreed
  • Grading of nonconformities and reporting method explained
  • Conditions for terminating the audit stated
  • Closing meeting format, date and attendees confirmed

During the audit

  • Documented information reviewed against the criteria
  • Evidence collected by interview, observation and record review
  • Sample selected, with the basis for selection noted
  • Every finding backed by a record reference, not recollection
  • Significant risks reported immediately to auditee and audit client
  • Out-of-scope issues noted for the audit client
  • Daily team discussion and auditee review held

Before the closing meeting

  • Findings graded and reviewed by the team
  • Facts for each finding agreed with the process owner
  • Audit conclusions drafted within the limits of the sample
  • Corrective action process and timeframes explained

After the audit

  • Report issued to the audit client, and to the auditee where required
  • Corrective action follow-up scheduled

Conclusion

careful document review and clear roles for team members and guides. Following these steps keeps audits effective, objective and actionable.

PopularCert provides expert guidance on on-site audit execution and management system compliance. Partner with PopularCert to run audits that meet international standards efficiently and reliably, or return to the Complete ISO Audit Guide for the full series.

Sources and Further Reading

Conclusion

Successful on-site audit execution relies on structured opening meetings, active communication, careful document review, and clear roles for team members and guides. Following these steps ensures audits are effective, objective, and actionable.

We provide expert guidance for on-site audit execution and management system compliance. Partner with Popularcert to conduct audits that meet international standards efficiently and reliably.

FAQ

 To confirm the audit plan, introduce the team and establish communication with the auditee.

 Through daily discussions and agreed reporting methods, which keep findings clear and let action start promptly.

 Auditors select a representative sample of records, activities and people based on risk and the audit plan, then verify it through document review, interviews and observation. Conclusions apply to what was sampled, and the sample may be extended if findings suggest a wider issue.

 Guides assist and facilitate the audit without influencing outcomes. Observers must not interfere.

 An audit may be aborted if documentation is insufficient, senior management commitment is lacking, major system issues exist or co-operation is missing.