Proper planning is the backbone of a successful audit. Preparing an audit plan, assigning responsibilities, and creating working documents like checklists ensures audits are efficient, structured, and aligned with organizational objectives. Refer our blog on Audit Team and Document Review
Table of Contents
Preparing the Audit Plan – Audit Timetable
Following the audit planning principles outlined in ISO 19011 (the international guideline for auditing management systems), the audit team leader develops an audit plan that sets shared expectations among the audit client, audit team, and auditee before work begins. In practice, we find the biggest source of friction isn’t the plan’s structure auditees generally understand why a plan exists it’s timing: plans distributed too close to the audit date leave little room for an auditee to flag scheduling conflicts or resource gaps before they become disruptions on audit day.
The amount of detail provided in the audit plan should reflect the scope and complexity of the audit, as well as the effect of uncertainty on achieving the audit objectives.
Check out our blog on Conducting On-Site Audit Execution
In preparing the audit plan, the audit team leader should be aware of the following:
- The appropriate sampling techniques
- The composition of the audit team and its collective competence
- The risks to the organization created by the audit
For example, risks to the organization may result from the presence of the audit team members influencing health and safety, environment, and quality, and their presence presenting threats to the auditee’s products, services, personnel, or infrastructure (e.g., contamination in cleanroom facilities).
For combined audits, particular attention should be given to the interactions between operational processes and the competing objectives and priorities of the different management systems.
The details may differ, for example, between initial and subsequent audits and between internal and external audits.
The audit plan should cover the following:
- The audit objectives
- The audit criteria and any reference documents
- The audit scope, including identification of the organizational and functional units and processes to be audited
- The locations, dates, expected times, and duration of audit activities to be conducted, including meetings with the auditee’s management
- The expected times and duration of audit team meetings
- The audit methods to be used, including the extent to which audit sampling is needed to obtain sufficient audit evidence and the design of sampling program, if applicable
- The roles and responsibilities of the audit team members as well as guides and observers
- The allocation of appropriate resources to critical areas of the audit
The audit plan may also cover the following, as appropriate:
- Identification of the auditee’s representative for the audit
- The working and reporting language of the audit where this is different from the language of the auditor or the auditee or both
- The audit report topics
- Logistics and communication arrangements including specific arrangements for the locations to be audited
- Any specific measures to be taken to address the effect of uncertainty on achieving the audit objectives
- Matters related to confidentiality and information security
- Any follow-up actions from a previous audit
- Any follow-up activities to the planned audit
The audit plan may be reviewed and accepted by the audit client and should be presented to the auditee. Any objections by the auditee on the audit plan should be resolved between the audit team leader, the auditee, and the audit client.
Trending Posts
Get Free Consultation
Our Clients
Projects
Our Happy Clients
⭐⭐⭐⭐⭐
“PopularCert made our ISO certification process smooth and professional.”
— Manufacturing Client, Oman
⭐⭐⭐⭐⭐
“Excellent support and documentation guidance.”
— Healthcare Client, Saudi Arabia
⭐⭐⭐⭐⭐
“PopularCert simplified our ISO certification process with professional guidance and fast support.”
— Manufacturing Client, Saudi Arabia
A Common Planning Mistake We See
One of the most frequent gaps in audit plans we review isn’t missing content it’s vague scope definition. An audit plan that says “review quality management processes” gives an auditee no real sense of what to prepare, while one that specifies “review nonconformity handling for the last two surveillance cycles, plus internal audit records from Q3-Q4” lets the auditee’s team prepare the right documents in advance, making the actual audit day faster and less disruptive for everyone.
Audit Notification
The audit team leader is responsible for issuing the formal notification, ensuring that all required information is included and sent to relevant persons in both the auditing and audited organization’s.
For external audits, the audited organization will receive its first formal notification through a letter. The following requirements/arrangements need to be addressed in the audit notification:
- Audit dates
- Lead Auditor name
- Audit team members and their responsibilities
- Number of groups and accompanying persons needed
- Facilities required
- Confirmation on the scope of the audit and management system documents status (scope to be clearly defined)
- Formal notification to the auditee
As soon as the audit team is informed with the history of the auditee, the final accepted scope of the audit and status of documentation, the audit checklist can be prepared and submitted for review by the lead auditor. Normally, the audit timetable forms part of the notification.
Assigning Work to the Audit Team
The audit team leader calls the audit team and chairs the audit-planning meeting. During the meeting, the lead auditor enables audit team members to prepare themselves appropriately for the audit. During the preparation time, the lead auditor maintains adequate control of the progress and process.
When an audit team comprising more than one auditor conducts an audit, the audit team leader, in consultation with the audit team, should assign each team member responsibility for auditing specific management system processes, activities, functions, or locations. Such assignments should take into account the independence and competence of auditors and the effective use of resources, as well as different roles and responsibilities of auditors, auditors-in-training, and technical experts.
Audit team briefings should be held as appropriate by the audit team leader to allocate work assignments and decide possible changes. Changes to the work assignments can be made to ensure the achievement of the audit objectives.
Preparing Working Documents
The audit team members should collect and review information relevant to their audit assignments and prepare work documents as necessary for reference and for recording audit evidence. Such work documents may include:
- Checklists and audit sampling plans
- Forms for recording information, such as supporting evidence, audit findings, and records of meetings
The use of checklists and forms should not restrict the extent of audit activities, which can change because of information collected during the audit. Work documents, including records resulting from their use, should be retained at least until audit completion or as specified in the audit plan.
Those documents involving confidential or proprietary information should be suitably safeguarded at all times by the audit team members. The audit team members should review the relevant information related to their audit assignments and prepare any work documents necessary for those assignments.
A professionally conducted audit needs preparation. Information needs to be gathered, verified as accurately as possible, and reviewed. Checklists must be prepared or at least reviewed.
Audit Checklist
What is an audit checklist?
This is the most important tool of the auditor. During preparation, the auditor must spend sufficient time to prepare a complete checklist. Auditors should keep in mind that the audit checklist is a memory aid, bridging the gap between preparation and evaluation.
During the audit, the checklist serves as a record for information received from the auditee and again bridges the gap between evaluation and feedback.
How is an audit checklist prepared?
A checklist is a collection of key points and important characteristics extracted by the auditor during preparation from the information available for evaluation and verification purposes during the audit. Points written down on the checklist will become the specific areas investigated during the audit.
Usually, the checkpoints will include both the requirement and the reference to the requirement. The prompts are based on certain actions required or trigger words like “shall,” “must,” “procedure,” “records,” etc.
Principles for preparing practical checklists
- Know the auditee’s environment
- Study the auditee’s documentation thoroughly
- Know the reference standards and requirements
- Be aware of your impact on the interviewed person
- Maintain objectivity; be impartial
- Know what questioning techniques should or should not be applied
Although the checklist may vary depending on the type of audit (system, product, or process), there should always be reference to specific aspects.
Conclusion
Effective preparation for on-site audits sets the foundation for a smooth, objective, and reliable audit process. Planning, assigning responsibilities, and creating structured documentation ensure audit efficiency and compliance.
We provide expert audit planning and documentation services to help organizations conduct audits confidently and meet international standards. Partner with Popularcert to make your audits streamlined and effective.
FAQ
Why is an audit plan necessary?
It defines scope, objectives, roles, and schedules to ensure efficient and organized audits.
What is included in an audit checklist?
Audit criteria, key points, documentation references, and prompts for evaluation.
How are work assignments distributed in an audit team?
Assignments are based on auditor competence, independence, and the specific processes to be audited.
Why safeguard working documents?
To protect confidential or proprietary information collected during the audit.